Lumiar
18 dwellings
22 parking spaces
3.83 M€ total investment by the cooperative (excluding VAT)
213.000 € average cost per home
gross construction area: 3,163m2
1.678m2 housing
459m2 retail and social project
1.026m2 parking lot
types:
5 - T1 146.000 €*
9 - T2 216.000 €*
4 - T3 289.000 €*
* Estimated cost of works in accordance with preliminary project. Urbanization works to be carried out by the Municipality of Lisbon. Does not include construction management and supervision costs, administrative costs and financing costs.
Resources and timetable
Encontre todos os documentos úteis, esclareça dúvidas frequentes e acompanhe o cronograma da operação.
Preliminary Draft Technical Files
-
-
-
-
-
Calendarização (pdf) 880 KB
-
Estimativa-valor (pdf) 375 KB
-
Inquérito (pdf) 678 KB
-
-
-
-
-
-
Imagens 3D (pdf) 977 KB
-
-
-
Analysis of proposals
20-2-2025 a 16-4-2025
Selection and announcement of the selected cooperative
20-2-2025 a 16-4-2025
Public Act
29-1-2025
Reply to requests for clarification
13-12-2024
Clarification session
14-10-2024
Submission of Proposals
18-9-2024 a 28-1-2025
Clarifications on the procedural documents
18-9-2024 a 14-10-2024
Download the full schedule