1.1st Phase - Works inside the tunnel
Total closure of the tunnel for 10 months, with circulation assured on the surface
- Structural reinforcement
- Fireproofing
- Rehabilitation of all infrastructure
- HVAC, fire mains, pumping well, street lighting, generator set room and transformer substation (PT)
2.1st Phase - Surface works
Reopening the tunnel
- Refurbishment of the (existing) emergency exit at Avenida de Roma - South Exit
- Creation of a new emergency exit at the intersection of Avenida João XXI and Avenida de Roma - North Exit